El Cabo Windfarm

Owner: Iberdrola Renewables

Engineer: Bohannan Huston

General Contractor:  Sparling Construction Company, Inc.

Scope:

  • 40,000 CY of earthwork
  • 290,000 SY of subgrade prep
  • 290,000 SY of geo grid installation
  • 55,000 Tons of gravel placed
  • 2,500 CY of rip rap material placed
  • Installation of culvert crossings