Project:  PNM Reeves Solar Site

Engineer:  Miller Engineering Consultants

General Contractor:  Sparling Construction Company, Inc.

Project Scope:

  • 30,000 CY of material moved
  • 105 CY of Rip Rap Material Placed
  • 20 Acres of fine grading

 

 

PNM 2PNM